Submitting the Final Version of the Proposal Feedback Comments
This page provides instructions for participants in the JWST peer review process for submitting the final version of the proposal feedback comments. Each proposal is generally assigned both a primary and a secondary reviewer, but ultimately STScI needs a single “final” version of the proposal feedback comments for each proposal. Typically the primary reviewer incorporates the secondary reviewer’s comments into their own and then submits that as the final version of the proposal feedback comments. The documentation here describes how to do that.
On this page
Step 1
Start at the Panel Overview Page for a panel. You can get here from anywhere in the application by first clicking on the name of the review meeting in the navigation bar (which brings you to the review meeting Welcome Page), and then clicking one of the panels in the My Panels section on that page.
Step 2
In the Proposals & Assignments table, look in the Review column for a proposal that says “Needs final review (primary)”. This indicates a proposal that is in need of a final version of the proposal feedback comments, and where you are assigned as the primary reviewer. Click the proposal number for that proposal to go to its Proposal Page.
If you see a proposal that says “Needs my review”, that indicates that you have not yet completed your own feedback comments for the proposal. You should complete your own comments before you submit the final version. See the Entering Proposal Feedback Comments page in this documentation for instructions on how to do that.
If you see proposals that say “My review complete” but none that say “Needs final review”, then the panel PSS has not yet enabled submission of the final version of the proposal feedback comments. Please coordinate with your panel PSS about when that will be enabled, then refresh the page to see the updated status of the proposals.
Step 3
Words in bold are GUI menus/
panels or data software packages;
bold italics are buttons in GUI
tools or package parameters.
Coordinate with any other assigned reviewers about whether their feedback comments are complete. This should be done via Slack or face-to-face interactions, not through email. (SPIRIT does not currently show any indication of whether the other reviewers have completed their feedback comments.)
Step 4
Once you have confirmed that the other reviewers have completed their feedback comments, it is time to incorporate their comments into your own.
Return to the My Review tab and click Reopen Review to make your review editable again. You can then copy each section of the other feedback comments from the Panelist Reviews tab and paste them into the appropriate area of your own feedback comments. You may wish to edit or reword the combined content, for example to avoid redundancy or improve the consistency.
If you need to stop work on this effort and come back to it later, you can click the Save Review button to save what you have done so far.
Step 5
When you are done combining each section of the feedback comments, click the Submit as Final button. The button becomes disabled and changes to Submitting while the final feedback comments are being submitted, which can sometimes take a few moments. When submission is complete, the button will change back to Submit as Final.
Step 6
Switch to the tab labeled Final Review to see the submitted final version of the proposal feedback comments.
If you need to make minor edits to the final proposal feedback comments after submitting it, you can simply return to the My Review tab, click Reopen Review, and then after making your edits click Submit as Final again.
If you need to make more extensive edits, it is recommended that you first un-submit the final version of the proposal feedback comments by clicking the Revert to Reviewing button on the Final Review tab. You can then reopen, edit, and re-submit as described in the previous steps.
If the Revert to Reviewing button is not available on the final version of the proposal feedback comments, that generally means the panel chair or a panel PSS has already signed off on the final version. You would need to contact them about making any changes at that point.
Next: Viewing Final Ranking